Mine Gas Plant Upgrades
PPM were engaged to automate plant control and add new vacuum pumps.
Conveyor Spillage Reduction
PPM were engaged to reduce conveyor belt spillage at a coal terminal.
Optimising Steel Coil Handling
PPM were engaged to implement AGV’s to transport 16 tonne steel coils.
Improving Primary Crusher Remote Rock Breaker Operations
PPM were engaged to improve ore processing plant rock breakers.
Optimising Processing Plan Capacity
PPM were engaged to improve train load-out throughput and reliability.
Coal Preparation Plant Improvement
PPM were engaged to improve the reliability of an older Coal Washery.
Stockyard Throughput Increases
PPM were engaged to optimise a Stacker and Reclaimer control system.
Improving Iron Ore Export Plant Reliability
PPM were engaged to improve reliability and optimise a major Iron Ore plant.